The operating system a package manager actually runs.

Seven execution stages plus the morning controls board — SPI, BOQ vs MB vs RA, HSE, lookahead, stores and BOCW — on the same tenant as payroll.

India construction

Site works — planning to handover

A first-class construction pack on the same tenant as payroll and attendance. Programme, stores and RA bills inherit the live project — they do not live in a parallel spreadsheet. Project controls show SPI, BOQ vs MB vs billed, HSE and lookahead every morning.

  • WBS, drawing register, programme built from WBS, resource plan, SPI vs planned dates
  • Tender register, BOQ, rate analysis written back, award onto the project
  • Indent → approve → PO → GRN → issue to WBS with stock control and low-stock watch
  • DPR, weather-lost days, muster, plant log, measurement books and RA with retention + GST
  • BOQ vs executed vs billed, safety incidents, quality NCRs, BOCW cess, CLRA licences, snags that gate as-built / DOC / O&M